PT ESSA Industries Indonesia Tbk. (“EII”, part of ESSA)

PT Panca Amara Utama (“PAU”, part of ESSA)

Puri Akraya Engineering Limited

PT Makmur Sejahtera Wisesa

PT ESSA Industries Indonesia Tbk. (“EII”, part of ESSA)

ESSA operates the largest privately owned LPG processing facility in Indonesia. EII utilizes the most advanced technology in the world to ensure Indonesia stands at the forefront of global efficiency in production. It has a nameplate capacity of 190 MTPD of LPG and 500 BPD of Condensate.

LPG is manufactured by extracting propane and butane from natural gas, with heavier hydrocarbons extracted as condensate. It is commonly used in Indonesian homes for daily cooking. Indonesia renewed its focus on LPG production as the infrastructure to pipe gas to households on 17,000 islands is limited.

EII has received multiple safety awards for operating with an exemplary safety record and ensuring secure operations. The company has received “Zero Accident Award” for seven consecutive years from the Indonesian Ministry of Labour. EII endeavors to continue making positive contributions to Indonesia.

Visit website

PT Panca Amara Utama (“PAU”, part of ESSA)

PAU operates one of the world’s most efficient Ammonia facilities. It uses KBR’s Reforming Exchanger System & Purifier Technology to run its operations, the leading technology in ammonia production. This is the first ever application of this technology commercially, which places Indonesia at the forefront of ammonia production worldwide with a nameplate capacity of 1900 MTPD.

Its high plant utilization, stable operations, efficient turnaround times, and best-practice procurement capabilities all contribute to its attractive position on the global ammonia cost curve. 

In 2015, when IFC (World Bank) financed PAU, it was their largest commitment in Asia and won Project Finance Deal of the Year by The Asset. 

Ammonia, being the best carrier of hydrogen, is seen as the cleanest burning fuel of the future. PAU leads the way by having made great strides to convert 100% of its production to Blue Ammonia by 2025. Furthermore, with its Maleo Bird Conservation project, the management’s commitment to its environment is front and center.

Visit website

Puri Akraya Engineering Limited

Puri Akraya has expertly led, built and managed the Build, Operate and Transfer (BOT) of a world-class power plant in Timor Leste. Timor Leste’s first large Liquid-Fuel / Gas-Fired power plants, the Hera Power Plant & the Betano Power Plant, have been successfully supplying a large portion of Timor Leste’s power needs since completion in 2011.

Financed with extensive support from large international banks like HSBC, the plant was delivered in 11 months during a contractual timeline of 18 months, an outstanding feat given the remote location and limited infrastructure.

In June 2017, the company handed over plants and operations to the government of Timor Leste.

PT Makmur Sejahtera Wisesa

Financed by IFC (World Bank) as their last coal-based power plant financing, Akraya successfully led and managed the buildout of this 2x30MW plant in Tabalong, South Kalimantan. This plant was successfully acquired by PT Adaro prior to its completion.

PT Makmur Sejahtera Wisesa has been a strong contributor to the local economy by supplying electricity throughout South, Central and East Kalimantan. Within the first year, PT Makmur produced 148,428 MWh of electricity and reached an actual availability factor of 89.8%.

PT ESSA Industries Indonesia Tbk. (“EII”, part of ESSA)

PT Panca Amara Utama (“PAU”, part of ESSA)

Puri Akraya Engineering Limited

PT Makmur Sejahtera Wisesa